Customization: | Available |
---|---|
Warranty: | 1 Year |
Type: | Extrusion Blow Molding Machine |
Still deciding? Get samples of US$ 1/Set
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. It can be installed with programmable computer control and realize whole line intelligentize.
2. Provide products with high stability for customers.
3. Save 30%-80% energy and bring you prominent economic.
4.Using fameus server driver, special close loop calculated solution best energy saving.
Configuration | ||||
Clampingsystem | Double work stations translation + High-precision linear guideway | |||
Extrusion system | Hardened face gear reducer + Imported frequency inverter | |||
Die system | Special steel center-feeding die | |||
Hydraulic system | AlI imported hydraulic valve, seal parts + Electro-hydfaulic proportional control | |||
Control system | Imported PLC + Imported Human-machine interface + PLC automatic temperature control module |
Parameters | ||||
Specifications | Units | TJ-HBD2L | TJ-HBD5L | TJ-HBD15L |
Material | PE PP.PVC.PA … | PE PP.PVC.PA … | PE PP.PVC.PA … | |
Max.product capacity | L | 2 | 5 | 15 |
Die quantity | Set | 1.2.3.4 … | 1.2.3.4… | 1.2.3.4 … |
Machine dimension | M | 4.0x3.0x2.8 | 4.0x3.0x2.8 | 5.5x3.7x3.8 |
Machine weight | Ton | 5.5 | 7.8 | 8.3 |
Die-head | ||||
Max.diameter of die | mm | 160 | 180 | 260 |
Center distance of double die | mm | 60 | 160 | 250 |
Die head heating power | KW | 5.2 | 9.4 | 11.3 |
Die head heating zone quantity | zone | 3 | 3 | 3 |
Clamping Unit | ||||
Clamping force | KN | 90 | 90 | 110 |
Distance between platens | mm | 135-485 | 230-620 | 230-820 |
Toggle stroke | mm | 450 | 650 | 700 |
Mold platen size | mm | 320X400 | 320X400 | 510X550 |
Extruder unit | ||||
Screw diameter | mm | 65 | 75 | 90 |
Screw L/D ratio | L/D | 25 | 25 | 25 |
HDPE plasticizing amount | Kg/h | 70 | 90 | 130 |
Screw heating zone quantity | zone | 4 | 3 | 5 |
Screw heating power | KW | 10.2 | 13.5 | 20 |
Extruder driving power | KW | 15 | 22 | 37 |
Power | ||||
Total power consumption | KW | 41.4 | 55.9 | 92.3 |
Hydraulic drive power | KW | 11 | 11 | 24 |
Cooling water consumption | m3/h | 3 | 4 | 6 |
Cooling water pressure | Mpa | 0 3-0.6 | 0 3-0.6 | 0 3-0.6 |
Air pressure | Mpa | 0.8 | 0.8 | 0.8 |
Air consumption | m3/min | 0.4 | 0.8 | 1 |
Why choose us?
1.Our factory was founded in 1953 and we are market-leader in this line in China.
2.In the plastic machinery field, we have more than 30 years of relevant experience.
3.Our products extend all over the national and over 90 countries and areas of the world.
4. Our spare parts are international famous brand components.
5. Engineering team provide you with the most suitable model towards your products.
6.We will send our engineers to your factory installation the machine and train your worker after the machine
arrive your factory.
7.We will offer our best price and quality and hope have a good cooperation with you.
8.Our machines run stable, high output and our technology from German.
Q1:What's your warranty policy?
A1:The Seller will guarantee the machine for 18 months since the date of shipment(that is leaving from Seller's
factory) or the seller will guarantee the machine for 12 months since the date of starting installation and adjustment,
whichever comes first.
Q2:What's your minimum order quantity?
A2:Min order quantity:1 set or by negotiate with each other.
Q3:What package do you use for the product?
A3: Be Coated with anti-corrosion oil, and covered with plastic film, then packed in wooden box.
Q4:Do you have technical instruction if I buy your product?
A4:Please read the user manual carefully for your reference, we have detail instruction on it. If your problems still
can not be solved, welcome to contact us for help.
Q5:What is your overseas service?
A5:We will provide high quality overseas service ,our technical staff will be able to provide you with technical support,
for you personally to overseas assembly and test equipment.
Q6:Will you conduct training for our staff here?
A6:Yes, we will provide technology support to factory technology, training for the relative person.
Q7:What are your terms of payment?
A7:We accept T/T, L/C, D/P,Western Union, Paypal, Money Gram.
Q8:I am very satisfied after I read your FAQ, how can I start to purchase my order?
A8:Please click the bottom of this page or contact our sales on Trade Mange online!
Click on the image for details!